A standard minute value is the time a job should take when done at a normal working pace, including the rest a person needs to keep that pace up all day. It is the number production planning, costing, and line balancing all rely on.
This dashboard takes you from a stopwatch at the machine to that figure, and then tracks how operators perform against it. You do not need prior training in work measurement — the study screen explains each step as you reach it.
Everything you enter is saved in this browser as you type, and is still there when you come back. Nothing is sent anywhere.
The header carries three controls: the rating scale your plant uses, EXAMPLE to load a complete worked study for reference, and CLEAR to wipe everything and start fresh. Study data and operator logs both export as CSV.
No readings yet. Run a study to fill this sheet, or load the example from the header.
{{ allowNote }}
{{ plainSmvTxt }}
{{ anchorTxt }}
{{ flatRatingTxt }}
SENT — OPEN THE CALCULATE TAB TO CONTINUE
Snapback timing: Record writes the split since the last tap into the next free slot below and restarts the count.
{{ outlierTxt }}
Set by the ILO table below — override here if your plant uses an agreed figure.
Pick the workstation that matches, then tune if you need to. Constant allowances are always 9%.
{{ iloSnapTxt }}
APPLIED — ALLOWANCE NOW {{ iloTotal }}
No shifts logged for this operator yet. Add one below.
{{ lgWarnTxt }}
SHIFT ADDED
Nothing logged yet.
Each formula with what it is for and a worked example using the dashboard's default figures.
Corrects the stopwatch reading for how fast the worker was actually going. A rating above the base means they beat standard pace, so the basic time is longer than what you timed.
Adds the paid time a worker cannot spend producing — rest, personal needs, unavoidable delay — so the standard is achievable across a full shift rather than for one perfect cycle.
Each element is rated on its own — a worker can be fast at one and slow at another — then the basic times add up before the allowance is applied once to the whole product.
Compares the standard minutes the line earned against the minutes it was paid for. 100% means output matched exactly what the SMV says it should be; most lines run 75–85%.
Turns the SMV into a shift goal. Setting E below 100% builds in the efficiency the line realistically holds, so the target is one the operators can actually hit.
Tells you when you have enough readings to stop timing. The more the readings scatter, the more of them you need before the mean can be trusted to the accuracy you claimed.
Builds the time from the movements themselves, so there is nothing to rate and no stopwatch needed. The result is already basic time at standard pace — add your allowance to reach an SMV.
Tap “New problem” to begin. Problems rotate across SMV, efficiency, targets, MOST, and time study statistics.
{{ probAsk }}
Read the scenario and estimate the observer rating. Standard pace is {{ scaleTxt }} on the scale in use. Professional tolerance is ±5 points at base 100.
Tap “New scenario” to begin. Practise until you consistently rate within tolerance.
{{ scenTxt }}
{{ lgWarnTxt }}
{{ calExp }}
Builds the time from the movements themselves instead of a stopwatch, so there is nothing to rate. Useful when you cannot observe the job, or to check a study you have already run.
{{ mmDesc }}
{{ exD }}