Cycle Time & Waste Analysis Tool
Time observation, VA/NVA split and TIMWOODS waste breakdown
← Portfolio Hub
What do VA/NVA and TIMWOODS mean?
Value-Added vs Non-Value-Added
VA
— the customer would pay for this step if they could see it happening (fitting a part, assembling a component).
NVA
— the process needs it right now, but the customer gets no value from it (walking, waiting, rework). Tag every NVA step with a waste type below.
The 8 Wastes — TIMWOODS
Transport
— unnecessary movement of material or product
Inventory
— more stock or WIP than needed right now
Motion
— unnecessary movement by people
Waiting
— idle time for material, info or a machine
Over-production
— making more/sooner than needed
Over-processing
— doing more than the spec requires
Defects
— errors, rework or scrap
Skills
— not using people's knowledge or ideas
How to run the study
Fill in shift length, breaks and demand to get a takt time
List each step in order, timing 3–5 repeat cycles per step
Mark VA/NVA, tag the waste type on NVA steps
Use the waste breakdown to prioritise what to fix first
Study Setup
Process / Line
Date
Observer
Shift Length (min)
Breaks (min)
Customer Demand (units/shift)
Total Cycle Time
0.0s
Value-Added %
0.0%
0.0s VA / 0.0s NVA
Takt Time
0.0s
per unit, from demand
vs Takt
-
Time Observation
#
Process Step
C1 (s)
C2 (s)
C3 (s)
C4 (s)
C5 (s)
Avg (s)
VA/NVA
Waste Type
Notes / Action
+ Add Step
Load Example Data
Export CSV
Export Backup
Import Backup
Clear All
Waste Breakdown (TIMWOODS)
Waste profile — % of total cycle time per category
Are you sure?
Cancel
Confirm